Texas abatement requirements
In Texas, lead abatement in a pre-1978 home has to be done by a DSHS-certified firm and certified individuals. The firm, not you, tells DSHS at least seven working days before work starts, with one notice per building. Plan that lead time into your schedule. Renovation that disturbs lead paint without aiming to remove it falls under the EPA’s RRP rule instead.
Scheduling exterior work in Central Texas heat
Kyle summers are long. Normal daily highs reach 90°F by May 26 and stay above it until September 23, and humid Gulf air can occasionally push the heat index past 110. Containment sheeting, respirators and protective suits make that heat harder on workers, and very hot surfaces affect how primers and paints cure. Spring and fall give siding and porch work an easier window. Interior abatement is far less tied to the season.
Not sure which surfaces have lead? Start with lead paint testing and inspection. If the paint is sound and you would rather leave it in place, compare lead paint encapsulation and enclosure. For our other services, go to the home page.