Texas abatement requirements
Lead abatement in a pre-1978 Texas home has to be done by a firm and individuals certified by DSHS under the Texas Environmental Lead Reduction Rules. Under 25 TAC 295.214 the certified firm notifies DSHS, through its notification system and the DSHS regional office, at least seven working days before abatement begins, with one notification per separate building. Build that lead time into any schedule. Renovation that disturbs lead paint without aiming to remove it falls under the EPA’s RRP rule instead.
Scheduling exterior work in Central Texas heat
Kyle summers are long. The National Weather Service’s Austin climate summary, a regional reference for Kyle, shows normal daily highs reaching 90°F by May 26 and staying above it until September 23, and Gulf moisture can occasionally push heat indices past 110. Containment sheeting, respirators and protective suits make that heat harder on workers, and very hot surfaces affect how primers and paints cure. Spring and fall give siding and porch work an easier window; interior abatement is far less tied to the season.
Not sure which surfaces contain lead? Lead paint testing and inspection comes first. If the paint is sound and you would rather leave it in place, compare lead paint encapsulation and enclosure. Kyle Lead Paint Removal covers the other options.